• More than 40 sustainable features have been incorporated into the design of the Phase II Residence Halls.
    More than 40 sustainable features have been incorporated into the design of the Phase II Residence Halls.
  • The Outback, about three acres of undeveloped land, has been reserved to preserve and restore native plants. [Sustainable Sites (SS) Credits 5.1 and 5.2]
    The Outback, about three acres of undeveloped land, has been reserved to preserve and restore native plants. [Sustainable Sites (SS) Credits 5.1 and 5.2]
  • Phase II solar panels reduce CO2 emissions by more than 300,000 pounds and generate 118,000 kilowatt hours of renewable energy annually, supplying 10 percent of the buildings' energy demand each year. [Energy & Atmosphere (EA) Credits 2 and 6]
    Phase II solar panels reduce CO2 emissions by more than 300,000 pounds and generate 118,000 kilowatt hours of renewable energy annually, supplying 10 percent of the buildings' energy demand each year. [Energy & Atmosphere (EA) Credits 2 and 6]
  • The green roofs and living wall in Phase II not only reduce the 'heat island' effect, but filter and decrease rainwater run-off. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
    The green roofs and living wall in Phase II not only reduce the 'heat island' effect, but filter and decrease rainwater run-off. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
  • Living Wall on the west wall of West Hall. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
    Living Wall on the west wall of West Hall. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
  • Throughout the site, stormwater percolates into the groundwater table via pervious pavers, planted detention basins and a lawn of grass pavers. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
    Throughout the site, stormwater percolates into the groundwater table via pervious pavers, planted detention basins and a lawn of grass pavers. [Sustainable Sites (SS) Credits 6.1, 6.2 and 7.2]
  • Bathrooms feature low-flow shower heads, faucets and toilets. Its graywater system is designed to capture and filter up to 90,000 gallons per month from residence showers and sinks, processing enough water to meet the project's irrigation needs. [Water Efficiency (WE) Credits 1 and 3]
    Bathrooms feature low-flow shower heads, faucets and toilets. Its graywater system is designed to capture and filter up to 90,000 gallons per month from residence showers and sinks, processing enough water to meet the project's irrigation needs. [Water Efficiency (WE) Credits 1 and 3]
  • Pitzer's drought-tolerant landscape is irrigated through high-efficiency drip or below grade systems regulated by climate-based controllers. [Water Efficiency (WE) Credits 1 and 3]
    Pitzer's drought-tolerant landscape is irrigated through high-efficiency drip or below grade systems regulated by climate-based controllers. [Water Efficiency (WE) Credits 1 and 3]
  • Green Bike Program building
    The Green Bike Program loans about 250 bikes a year to students, faculty and staff. Phase I and Phase II each provides covered parking for 50 bikes. [Sustainable Sites (SS) Credit 4.2]
  • To protect indoor air quality, all adhesives, sealants, paints, coatings, flooring and wood products were selected for their environmentally friendly compounds and low levels of off-gassing. [Indoor Environmental Quality (IEQ) Credits 4.1—4.4]
    To protect indoor air quality, all adhesives, sealants, paints, coatings, flooring and wood products were selected for their environmentally friendly compounds and low levels of off-gassing. [Indoor Environmental Quality (IEQ) Credits 4.1—4.4]
  • The residence halls are constructed with materials made of recycled content including structural steel, concrete, gypsum board, carpeting and insulation. [Materials & Resources (MR) Credits 4, 5 and 7]
    The residence halls are constructed with materials made of recycled content including structural steel, concrete, gypsum board, carpeting and insulation. [Materials & Resources (MR) Credits 4, 5 and 7]
  • Without jeopardizing security, exterior lighting is minimized and screened to prevent artificial light from polluting the night sky. [Sustainable Sites (SS) Credit 8]
    Without jeopardizing security, exterior lighting is minimized and screened to prevent artificial light from polluting the night sky. [Sustainable Sites (SS) Credit 8]
  • Student rooms are designed to reduce energy and water use. Natural daylight decreases the need for electric lights, overhangs lessen A/C demand and low-flow plumbing reduces water waste. [Energy & Atmosphere (EA) Credit 1.3, Water Efficiency (WE) Credit 3.1, Indoor Environmental Quality (IE) Credit 4.1]
    Student rooms are designed to reduce energy and water use. Natural daylight decreases the need for electric lights, overhangs lessen A/C demand and low-flow plumbing reduces water waste. [Energy & Atmosphere (EA) Credit 1.3, Water Efficiency (WE) Credit 3.1, Indoor Environmental Quality (IE) Credit 4.1]

Green Building

Robert Redford Conservancy for Southern California Sustainability

Robert Redford Conservancy building

The Robert Redford Conservancy, located on 12 acres north of Pitzer’s main campus, held its first full semester of classes and programming in spring ’18 following a year-long renovation of the historic Claremont Colleges infirmary. That top-to-bottom renovation turned an abandoned, nearly 90-year-old facility into a showcase for responsible, collaborative green building. In addition to earning USGBC’s highest LEED certification in the New Construction and Major Renovation category, the Redford Conservancy is on track to becoming The Claremont Colleges’ first net zero energy building, meaning it produces as much energy as it uses over the course of the year. For more information on the Redford Conservancy building, click here.

The Residential Life Project

In 2001, Pitzer reimagined its campus. The College committed itself to expanding in an environmentally responsible fashion and proving that green blueprints could shrink carbon footprints. The 2003 Housing Master Plan proposed new residence halls designed with both architectural flair and eco-friendly features.

The first phase of Pitzer’s Residential Life Project was so green it won gold, earning top marks from the US Green Building Council (USGBC). Opened in fall 2007, the new residence halls of Phase I—Atherton Hall, Pitzer Hall and Sanborn Hall—received USGBC’s Leadership in Energy and Environmental Design (LEED) Gold certification.

Five years later, Phase II of the project earned LEED Platinum, USGBC’s highest possible endorsement. Home to more than 300 students, Phase II houses the Mosbacher/Gartrell Center for Media Experimentation and Activism, the Pitzer Archive and Conference Center, the Kallick Family Gallery and the Office of Study Abroad and International Programs. The four Phase II buildings feature seminar rooms, multimedia editing suites, a demonstration kitchen and apartments for live-in staff and faculty.

More than 40 sustainable features have been incorporated into the design of the residence halls, including:

  • Generating electricity with fossil fuels is the largest single source of CO2 emissions in the US, accounting for about 40 percent of the nation’s total CO2 emissions. Solar panels on Phase I buildings provide about 28,000 kilowatt hours of renewable energy annually. Solar power is quadrupled in Phase II buildings, generating about 118,000 kilowatt hours and reducing CO2 emissions by more than 300,000 pounds per year.
  • The green roof in Phase I blankets about 1,200 square feet, covering the roof with vegetation that helps insulate the building and generate oxygen. The green roof areas in Phase II encompass about 5,000 square feet. Phase II also features a living wall, creating a vertical garden to help filter and feed the air. Green roofs and living walls reduce the amount of rainwater runoff and the “heat island effect”—the increased temperatures in urban areas largely caused by buildings with dark, non-reflective surfaces that absorb heat.
  • In Phase II, a graywater system collects and treats water from showers and sinks. This graywater provides all the irrigation for Phase II landscaping, up to 90,000 gallons per month.
  • Permeable concrete has been used in both phases for various hardscape elements such as courtyards and walkways. Permeable concrete is as structurally sound as typical concrete but is more porous, increasing the amount of storm water that seeps into the aquifer.
  • Storm water retention basins also capture rain runoff, storing the water and allowing it to percolate into the aquifer through a large perforated pipe system.
  • The residence halls were constructed with materials made from recycled content, including structural steel, concrete, gypsum board, carpeting and insulation. Approximately half of the wood-based materials came from established, managed forests. Waste from the construction site was carted off for recycling or reused on campus.
  • Recycled, renewable and regional: The residence halls were constructed with materials made from recycled content, including structural steel, concrete, gypsum board, carpeting and insulation. More than 20 percent of these materials were manufactured within 500 miles of campus. Approximately half of the wood-based materials came from established, managed forests. Waste from the construction site was carted off for recycling or reused on campus. After Sanborn Hall was demolished in Phase I, a portion of the building was ground up and used as base material to structurally reinforce the new basketball courts.
  • In Phase II, the green-belt areas that encompass the new residential halls are equal in size to the footprint and hardscape of each building. The amount of open green space and roofs exceeds zoning requirements by 68 percent.
  • Drought-tolerant plants dominate surrounding landscaping. Water usage is kept to a minimum through high-efficiency irrigation with a control system that adjusts to changing weather conditions. All the water needed for Phase II irrigation will be met through the graywater system.
  • Bathrooms feature low-flow shower heads, faucets and toilets. Through these and other measures, Pitzer has decreased water usage since 2002 by nearly 50 percent.
  • The buildings are heated and cooled with high-efficiency chillers, boilers and pumps. Along with the use of energy-efficient lighting, insulation and windows that allow for natural ventilation, this heating and cooling system keeps energy consumption about 30 percent lower than LEED baseline standards, translating into a cost savings of approximately $35,000 a year.
  • Low-emitting adhesives, sealants, paints and carpets are used in residential rooms and halls, reducing the amount of off-gassing and volatile organic compounds (VOCs) released into the atmosphere.

The President’s Residence

Pitzer President's Residence / Photography by Tom Bonner Job ID

In June 2014, the rehabilitated Pitzer College president’s residence became the first single family residence in Claremont, Calif. to earn Leadership in Energy and Environmental Design (LEED) for Homes certification from the U.S. Green Building Council (USGBC). Improvements that are both environmentally friendly and historically faithful are notoriously challenging, but historic preservation architecture firm Kelly Sutherlin McLeod Architecture, Inc.and Pitzer’s Facilities Department teamed up to create green blueprints that meet the USGBC’s standards for outstanding energy and environmental design. Landscape Architect Lisa Gimmy designed drought-tolerant landscaping that complements the house, the neighborhood and Pitzer’s own low-water campus. The builder, HartmanBaldwin, Inc., followed USGBC’s environmentally responsible construction criteria to ensure that the house met LEED standards.

Pitzer College is also committed to creating an accessible campus. The original section of the president’s residence was built just after World War I, more than 70 years before the passage of the Americans with Disabilities Act. To address accessibility issues, the project design team adapted and expanded the existing structure. The side and back yards were re-graded to make the house’s ground level gathering spaces and outside areas accessible. The president’s house now has two accessible bathrooms and a welcoming, accessible entry. For more information, click here.

LEED Green Building Council seal